Case Studies in:
Sectors: Rail
Rail
Walker Construction provides a wide range of civil, building, mechanical and electrical services across the rail network. Our experienced Rail Division have successfully delivered schemes in what is commonly know as a 'challenging environment' focusing on safe, timely delivery in line with the clients operational and quality aspirations whilst minimising the impact on the live infrastructure. We have the ability to deliver a wide range of integrated and sustainable solutions for our clients who include Network Rail, HS1, train operating companies and multi-ntional contractors within the rail industry.
Dalston Kingsland Booking Hall
Walker Construction was employed to carry out refurbishment works at Dalston Kingsland Overground Station. The existing booking hall at the station was constructed in the 1980’s. It was decided due to increased usage of the Overground network the existing booking hall and gateline was insufficient to handle the passenger flow at peak times. To the immediate left of station was an existing disused retail unit that was to be incorporated into the station booking wall.
View Case StudyBlacksole Footbridge
This project was to complete a Design & Build contract for the construction of a new 52 metre pedestrian/cycleway bridge. This included associated works of footpaths and lighting to provide access to the new Altira Business Park in Herne Bay, Kent in collaboration with NuSteel Structures, WSS Construction Consultants (our internal Design Division), Urban & Civic and Kent County Council.
View Case StudySpalding Railway Station
May 2020 Walkers were instructed by Amco to undertake Platform Re-gauging works and Platform surfacing with block paving. Other works combined with the surfacing was the installation of new Aco drainage with a large capacity water soakaway system to the rear of the Platform.
View Case Study