Case Studies in:
Civils: Bespoke
Bridges
We have a proven track record in bringing communities together and improving the health and safety of the public, within the bridges sector. Read our case studies to learn more.
Flanchford Bridge
The beginning of this project consisted of the temporary damming of the River Mole to enable the existing bridge to be removed. We had to temporarily divert the utility services across the river using a scaffold bridge. Temporary foundations either side of the river were then created to support the heavy plant required to install the sheet piles and CFA Piles.
View Case Study