Completed Projects


Tesco, Tidworth

Location: Tidworth

Description: 278 Works

The works:

The works involved the installation of offsite highways works to facilitate a new Tesco store including, drainage, earthworks, landscaping, kerbs, footways, modular / concrete paved areas, installation of thermoplastic road marking and road studs, anti-skid surfacing along with base, binder and surface course installation which involved cold milling.  The installation of new fencing, pedestrian guardrails,  road signage, street lighting including LV connections and disconnections,  street furniture, traffic/pedestrian management and traffic signal installation.  We also had to manage the utilities plant for major diversion to minor diversion works.

For more information on this project please email us

Tesco Store, Yiewsley

Location: Yiewsley

Description: 278 Works

The works:

The works involved the installation of offsite highways works to facilitate a new Tesco store including, drainage, earthworks, landscaping, kerbs, footways, modular / concrete paved areas, installation of thermoplastic road marking and road studs, anti-skid surfacing along with base, binder and surface course installation which involved cold milling.  The installation of new fencing, pedestrian guardrails,  road signage, street lighting including LV connections and disconnections,  street furniture, traffic/pedestrian management and traffic signal installation.  We also had to manage the utilities plant for major diversion to minor diversion works.

For more information on this project please email us

Carter – Stevenage

Location: Stevenage

Description: 278 Works

The works:

The works involved the installation of offsite highways works to facilitate a new Tesco store including, drainage, earthworks, landscaping, kerbs, footways, modular / concrete paved areas, installation of thermoplastic road marking and road studs, anti-skid surfacing along with base, binder and surface course installation which involved cold milling.  The installation of new fencing, pedestrian guardrails,  road signage, street lighting including LV connections and disconnections,  street furniture, traffic/pedestrian management and traffic signal installation.  We also had to manage the utilities plant for major diversion to minor diversion works.

For more information on this project please email us

Eaglestone Retaining Wall

Location: Milton Keynes

Description: Retaining Wall Repair Works

The works:

The works involved excavation of trial pits to establish form and geometry of foundations and trial holes to verify the position of Statutory Authorities plant.  We had to demolish the end garages at both eastern and western ends of the site.  We broke out hard material on line of steel sheets piles and excavated the pile trench. Installed sheet piles backfilling behind and reinstated the sheet pile installation trench.  We constructed the capping beam and installed the pedestrian parapet.  The linear drainage channel and finishings were then reinstated.  Topsoil and planting was carried out and the garages were then reconstructed replacing those that were demolished.

For more information on this project please email us

William Harvey Hospital – New Access Road

Location: Ashford, Kent

Description: New Access Road

The works:

The site comprised of open agricultural land to the north of the main parking facility serving the hospital and the project was to provide a new access road to facilitate the development of the area with additional medical services, together with alterations to the existing car parking facility and the provision of new infrastructure.  This was a conventional construction using tarmacadam materials, consisting of ground investigations, site clearance, earthworks, drainage, carriageway works with an stone mastic asphalt surface finish, road signs and markings, miscellaneous fencing and statutory undertakers works.  Specification for this development is using the highway works.

For more information on this project please email us

Engineers House, Woolwich

Location: Woolwich

Description: Car Park Works

The works:

The works were to extend the existing car park using Grass Crete Blocks and then we extended the existing retaining wall.  Once the wall was finished we installed a key clamp fence to the top of the wall.  We also fitted a knee rail fence to the perimeter of the extended car park.

We installed an automatic raise and low entry / exit barrier.

The works also involved some minor landscaping works to the area.

For more information on this project please email us

St Nicholas Church, New Romney

Location: New Romney

Description: Access re-construction works

The works:

The works involved alterations to the existing entrance to St Nicholas Church, including the removal of existing steps and pavement with earthworks to form a new access ramp.  We also Adjusted the surface water drainage and carried out alterations to the existing utility services.  The duration of 10 weeks included the construction time of 4 weeks and off site lead in time of 6 weeks.

For more information on this project please email us

Picketts Lane

Location: Picketts Lane

Description: Drainage Scheme

The works:

The works comprised of the local structural drainage repairs to the junction of Crossoak Lane and Picketts Lane working under a road closure supplied by Surrey County Council.

For more information on this project please email us

Ashford Borough Council

Location: Ashford, Kent

Description: Speed Ramp and Road Works

The works:

The works comprised of the removal and reinstatement of speed attenuation ramp and section of access road between the north and south car park sites at Ashford Borough Council.

For more information on this project please email us

SAGA Middleburg

Location: Sandgate, Kent

Description: Car Park Resurfacing Scheme

The works:

The works comprised of planning off the existing surface, resurfacing works and then re-applying the road markings.

For more information on this project please email us

Pembury Avenue

Location: Pembury Avenue

Description: Guardrail Replacement Works

The works:

The works comprised of the removal of damaged guardrail and the installation of a new 48mm dia powder coated hand rail and associated works including trial holes, brickwork and repainting repairs to the subway.

For more information on this project please email us

Whitehall Parade, Gravesend

Location: Gravesend

Description: Footway works for Tesco Express

The works:

The works comprised of the construction of a new footpath and all associated works to enable access to the new Tesco Express.

For more information on this project please email us

Feltonfleet School

Location: Cobham, Surrey

Description: Car Park Reconstruction Works

The works:

The works comprised of the replacement of the existing green plastic surfaced car park with a hard surface using Boddington BGT 100 geotexile and Tensar Triax TX160 geogrid and all associated works.

For more information on this project please email us

Sir Joseph Williamson School

Location: Sir Joseph Williamson School

Description: Playground Extension Works

The works:

The works comprised of the construction of an extended playground area and associated drainage and fencing works.

For more information on this project please email us

Tatsfield Village

Location: Tatsfield Village

Description: Traffic Management Scheme

The works:

The works comprised of alterations to the existing traffic management scheme at Tatsfield village centre and all associated works.

For more information on this project please email us

Folkestone Scout Hut

Location: Folkestone

Description: Timber Decking Works

The works:

The works comprised the installation of timber decking and the relocation of the steel gate to the front with new weldmesh panel making up the difference in size. We also put in concrete pavement in lieu of block paving.

For more information on this project please email us

VRES Perivale – Car Park Resurfacing

Location: VRES Perivale Industrial Park

Description: Car Park Works

The works:

The works involved the resurfacing of the car parking area and the provision of additional drainage.  This comprised of the laying of concrete surface overlay to existing slabs and installation of surface drainage channels including associated demolition work, saw cutting, pavers, kerbs, channels, safety/crash barriers and bollards to be undertken in five separate phases.

For more information on this project please email us

Angel Hill

Location: Sutton Common Road

Description: Crash Barrier Replacement Works

The works:

The works involved the installation of a temporary lane closure on Sutton Common road and a traffic diversion route.  The existing single box beam barrier was removed and replaced with a new crash barrier system in accordance with up to date regulations.  Due to restrictions the new barrier had to be installed on the same alignment as the existing barrier and therefore  a 450mm clearance could not be achieved.  The new barrier posts were installed with concrete surrounds.

For more information on this project please email us

St Clements Court

Location: St Clements Court

Description: Retaining Wall

The works:

The works involved the removal of existing retaining walls damaged by subsidence – these walls were made up of unreinforced brick bedded in cement mortar on a mass concrete strip foundation.  We then constructed a new retaining wall consisting of in-situ reinforced concrete foundation, blockwork wall with brick work fascia and metal work balustrade.

For more information on this project please email us

University Road

Location: University Road, Canterbury

Description: Road Reconstruction

The works:

The works involved the reconstruction of University Road including drainage repairs, installation of speed cushions, footway works, installation of a crossing point, road markings and guardrail installation.

For more information on this project please email us

Warren Lane, Ashford

Location: Warren Lane, Ashford

Description: Off Site Highway Works

The works:

The works involved widening the carriageway at Warren Lane for improved access to new development at the BUPA Care Home.  We formed a new bellmouth entrance to the home and laid the foul water rising main within the public highway.

For more information on this project please email us

Lippitts Hill Heli Pad

Location: Lippitts Hill

Description: Refurbishment Works

The works:

The works involved the construction of a new Heli-strip to enable low gradient take off and landing at the Air Support Unit and associated building works.  The works included civil engineering work to provide the levelled heli-strip surface.  The installation of associated ground drainage and the installation of manually operated aeronautical ground lighting and associated equipment.  We also carried out reinstatement works to the paddock structures and boundary fence lines and various other building works.

For more information on this project please email us

Winstanley Estate Phase 4

Location: Winstanley Estate

Description: Roadway resurfacing, Paving and landscaping works

The works:

The works involved the demolition of garages and formation of new parking bays.   Construction of new block entrances/staircase screens and boundary improvements,  estate lighting, roadway resurfacing,  paving and landscaping works.

For more information on this project please email us

Hoo Village

Location: Hoo Village

Description: Junction Improvement Works

The works:

The works involved minor alteration to the alignment of the junction with Church Street, the introduction of a flat-topped road hump, the reconstruction of the amenity area fronting the shops including laying high quality paving, drainage to a maximum depth of 1.2m and road lighting.

For more information on this project please email us

Longfield Road

Location: LONGFIELD ROAD, TUNBRIDGE WELLS

Description: 21ST CENTURY WAY CYCLE PATH

The works:

The works included kerbing, edging and surfacing works to provide a new cycle route, including tactile paving, earthworks, street lighting and associated electrical works, specialist surfacing, lining and signing works.

For more information on this project please email us

Caterham Street Scene

Location: CATERHAM STREET SCENE

Description: IMPROVEMENT WORKS

The works:

The works were to perform a high quality environmental enhancement to the Asprey Fountain scene using good quality street furniture and hard landscaping materials including all associated works.

For more information on this project please email us

Edinburgh Way, Harlow

Location: EDINBURGH WAY, HARLOW

Description: NEW WAREHOUSE FACILITIES

The works:

The works included the Installation of a three way traffic signalled controlled junction and Toucan crossing on the A414.

The Full depth construction of a filter lane and roundabout.

Planing and surfacing of the A414.

Anti-skid, roadmarkings, removal and installation of street lighting, installation of pedestrian guardrailing and drainage works.

For more information on this project please email us

Hodshrove Lane

Location: HODSHROVE LANE, BRIGHTON

Description: ENVIRONMENTAL IMPROVEMENT WORKS

The works:

The works comprised of the re-surfacing of the roads and footpaths, creation of a shared paved central zone including associated groundworks, street furniture, street lighting, soft landscaping and drainage.

For more information on this project please email us

Holmethorpe Industrial Estate

Location: HOLMETHORPE INDUSTRIAL ESTATE, REDHILL

Description: CONSTRUCTION OF NEW RELIEF ROAD

The works:

The works included the construction of a new relief road to connect Frenches Road to Ormside Way, along with the installation of road lighting columns, traffic signs, traffic lights, road markings and associated works.

For more information on this project please email us

Kings Lynn Car Park

Location: KINGS LYNN CAR PARK

Description: CONSTRUCTION OF CAR PARK

The works:

The works involved the construction of a 96 space car park as well as the construction of a bridge over the river to link the new car park to the existing car park. The works also included general site clearance, piling for the new bridge and lighting column bases, site drainage, fencing, earthworks, kerbing and paving works.

For more information on this project please email us

Littlestone RNLI

Location: LITTLESTONE INSHORE LIFEBOAT STATION - RNLI

Description: REPLACEMENT LIFE BOAT RAMP

The works:

We had to demolish the existing ramp and then construct a new ramp using PCC beams on tubular steel piled foundations.

To enable a more effective and speedier launching of the life boat in all weather conditions.

For more information on this project please email us

Poole Road Recreational Ground

Location: POOLE ROAD RECREATION GROUND

Description: CAR PARK EXTENSION

The works:

The works were to extend the existing car park and included excavation, installation of kerbs, concrete gullies, drainage pipes and precast soakaways chambers. The laying of new surfacing and the application of road markings to the new area and existing car park.

For more information on this project please email us

Sefton Road Recreational Ground

Location: SEFTON ROAD RECREATION GROUND

Description: MULTI-USE GAMES AREA

The works:

The works involved resurfacing the existing MUGA at Sefton Road including breaking out the old surface and removing concrete kerbs, laying new type 1 sub- base, DBM and concrete kerbs, and 6mm thick multi-use Leisureflex surfacing.

For more information on this project please email us

Pingle Drive, Bicester

Location: PINGLE DRIVE, BICESTER

Description: ACCESS ROAD IMPROVEMENTS

The works:

On this contract we carried out the Highway works including:-

Road alterations to form a new layout, the installation of islands and a roundabout, landscaping works, alterations to the pavement layout and service diversions.

For more information on this project please email us

The Street, Cobham

Location: THE STREET, COBHAM

Description: CONSTRUCTION OF ROAD / ENVIRONMENTAL WORKS

The works:

The works included the reconditioning of the existing carriageway, installation of new kerbed footways, surface water drainage, traffic signs and carriageway markings. On this contract we used 2300 tonnes of type 1 Ecoblend supplied to us by Day Aggregates.

For more information on this project please email us

Swalecliffe Skate Park

Location: SWALECLIFFE SKATE PARK

Description: CONSTRUCTION OF SKATE PARK

The works:

The works involved the construction of an outdoor concrete paved 51m x 22m permanent Skate/BMX Park with associated CCTV monitoring at Swalecliffe, Whitstable. Works Included formwork, concreting, sub base works, drainage, excavation, groundworks and earth moving.

For more information on this project please email us

Godington Play Area, Ashford

Location: GODINGTON PLAY AREA

Description: RENEWAL OF PLAY AREA

The works:

The works involved the removal of existing equipment, fencing and surfacing. Installation of new multi-use play equipment. Supply and installation of in-situ wet pour safer surface and bitumen macadam paths. All Ancillary works including edgings, ground works and reinstatement.

For more information on this project please email us

Redhill Bus Interchange

Location: REDHILL BUS INTERCHANGE

Description: REPLACEMENT OF PASSENGER SHELTER

The works:

The works involved the demolition of the existing passenger shelter and construction of a new semi-enclosed waiting area – the works also included the stripping out and refurbishment of the existing travel office and re-alignment of the existing concourse.

For more information on this project please email us

A217 Kingswood Tunnel

Location: A217 KINGSWOOD TUNNEL

Description: ROAD OVER RAIL VEHICLE INCURSION MITIGATION MEASURES

The works:

The works involved the reconstruction of the footway and the installation of a vehicle restraint system. We lowered the existing gully to level with the carriageway and re-directed the drainage outlet. Dropped kerbs and Vergemaster posts were also installed along with signing and road markings.

For more information on this project please email us

Folkestone West Station

Location: FOLKESTONE WEST STATION

Description: CAR PARK IMPROVEMENTS

The works:

The works involved installation of new fencing between car park and platforms, construction of new walkways from the platform to the coach waiting areas.

Construction of a new car park (incorporating the new marshall priors paving system) for South Eastern Railway Passengers and also a staff parking area.

The works also included new surface water drainage, construction of new Coach parking bays defined by raised islands.

Disabled parking area in accordance with DDA requirements, concrete kerbing to demarcate the car parking limits, tarmac works for surface finishing to car park.

Road markings to designate car parking, disabled areas and coach parking, installation of new lighting and power supplies.

Provision of new CCTV cameras and construction of concrete foundations for the location of bagged rubbish.

For more information on this project please email us

Waltham Cross Piazza

Location: WALTHAM CROSS PIAZZA

Description: PAVING WORKS

The works:

The works involved the removal and disposal of the existing paving and street furniture. The Installation of a complete new storm drainage system. We had to regulate the formation to achieve the new paving levels. We installed new Marshall York Stone paving and Tumble Setts, jointed with Easypoint mortar. New stainless steel street furniture along with relocating existing vehicle barrier’s were also installed. All the above works were undertaken without affecting the access to the shops and business within the area of works.

For more information on this project please email us

Brunel University Car Park

Location: BRUNEL UNIVERSITY

Description: NEW CAR PARK FACILITIES

The works:

Provision of new car parking facilities and associated works within the Unversity’s Uxbridge Campus. These works included spaces for 254 cars and 19 disabled bays; the removal of all paving, street furniture, metal rails, bollards etc.. that were no longer required. New tarmac car/coach parking over existing surface, new pave 50 permeable paving to designers details, new and adjustments to existing drainage and service diversions.

For more information on this project please email us

Proposed LIDL Development

Location: PROSPOSED LIDL DEVELOPMENT, POOLE

Description: S278 WORKS

The works:

The works involved the relocation of utility services, BT lines, a CCTV camera and widening of the B3068 Blandford Road to provide access into the proposed new Lidl Store.

For more information on this project please email us

Cleanaway, Sittingbourne

Location: CLEANAWAY, SITTINGBOURNE

Description: REMOVAL OF EXISTING LOADING RAMP

The works:

The works involved the removal of the existing Loading Ramp, the construction of a new ramp, an extension of the push walls and resurfacing of the Tipping Hall.

For more information on this project please email us