Completed Projects


Stamford Hill Embankment

Location: Stamford Hill to Seven Sisters Railway Line

Description: Embankment Stabilisation Works

The works:

The works involved the stabilisation of an existing embankment – the worksite was 270m long, truncated at the southern boundary by St Ann’s Road Underbridge and to the north by the Tottenham & Hampstead line rail Underbridge.  The embankment is up to 5m high and consists of re-worked London clay which needed to be stabilised.  The works included for the removal of the existing embankment vegetation and topsoil.  Approximately 534 Ishbeck 40/20 soil nails were installed up to a maximum length of 14m over the area of the embankment.  The embankment was then dressed with rabbit/badger netting.  A new cess path was constructed and supported by a piled retaining wall which consisted of Groudamat piles up to a depth of 4.0m at approximately 1.2m spacings along the length of the cess.

For more information on this project please email us

Gerrards Cross Railway Station

Location: Gerrards Cross Railway Station

Description: Painting Works

The works:

During green zone protection (T3 and T2H), we carried out pressure washing works to the platform canopy.  We also carried out preparation and painting works to all previously decorated surfaces of the  canopy including supporting structure, fascias, gable panels and roof soffit.

Cleaning was carried out to both sides of canopy glazing.  Cleaning of all rainwater goods including valley gutter and ensure free flowing was also undertaken.

We replaced both external down pipes located within the 6 ft Canopy.

For more information on this project please email us

Preston Park Station

Location: Preston Park Station

Description: Gauge Clearance Works

The works:

The works involved Gauge clearance mitigation works at a number of platforms and bridges.  Mainly consisting of lowering or setting back of platform copers.

For more information on this project please email us

Greenhithe Station

Location: Greenhithe Station

Description: Refurbishment Works

The works:

The works involved refurbishment to the Down and Up Platforms.  For the Down Platform the works included the clearing of vegetation, renovation of existing building, removal of the canopy, installation of new palisade fencing, reduction in the height of the wall around subway, the laying of new edgings, resurfacing of the platform.

The works for the Up Platform included the installation of acoustic fencing and new palisade fencing.  We also laid new edgings and installed new tactile behind copers, resurfaced the platform and refurbished the Annex Building.

For more information on this project please email us

Clapham Junction

Location: Clapham Junction

Description: Gauge Clearance Works

The works:

The works involved the provision of structural supports to the front face of the platform beneath the existing coping stone so that  the existing coping stone can be set forward to reduce the stepping distances.  Some coper heights had to be lowered.  We also installed the tactile paving stones along the platform and excavated and resurfaced the platform.

For more information on this project please email us

Faversham Station

Location: Faversham Station

Description: Platform Works

The works:

The works involved all associated works to construct extensions, adaptions and modifications to Platforms 1 and 2.

For more information on this project please email us

Chafford Hundred Station

Location: CHAFFORD HUNDRED STATION

Description: STATION REFURBISHMENT

The works:

The works involved minor demolition of some elements of the Station buildings to enable improvement works to take place. Construction of new pedestrian ramps along with associated stairs (as per above photos), retaining walls and railings. The works also involved the relocation of passenger gates within the station building plus the installation of an additional gate. New doors and windows were also constructed and floor and wall finishes both external and internal were replaced. Finally the existing platform shelter was extended.

For more information on this project please email us

Dormans Station

Location: DORMANS STATION, LINGFIELD

Description: SOUTH CENTRAL GAUGING WORKS

The works:

The work involved the removal of brick copers and corbelled out brickwork, to rebuild the previously removed platform face and lower the copers. We also had to supply and place tactile paving along the full length of the platform, regrade the platform to meet the required falls and supply and install drainage.
We resurfaced the platform with 60mm base and wearing course.

For more information on this project please email us

Hackney Wick Station

Location: HACKNEY WICK TRAIN STATION

Description: ACCESS RAMP

The works:

The work was done direct for Network Rail to install a disabled access ramp to the rear of the Up Platform into the station, the structure sits on a screwed pile foundation with a steel sub structure erected onto the piles, the ramp was then constructed using metal frame work with a paving slab infill.

For more information on this project please email us

Hampden Park Station

Location: HAMPDEN PARK STATION, EAST SUSSEX

Description: HAMPDEN PARK DOWN PLATFORM RECONSTRUCTION

The works:

Reconstruction of the down platform involving the replacement of the existing bull nose brick copers.

The raising of the platform riser throughout it’s length by an average of two courses using brick/concrete blocks.

Installation of offset stud buff coloured tactile paviors.

The resurfacing of the platform ensuring the correct cross falls with coated macadam dense heavy duty and high modular binder course aggregate.

Installation of heavy-duty drainage channels with boltless locking grates.

For more information on this project please email us

Southend East Station

Location: SOUTHEND EAST STATION

Description: REFURBISHMENT WORKS

The works:

The works involved the renovation of existing toilets and waiting room on platform 1. The provision of new access from Ambleside Avenue to Platform 1 including new access footpath, fencing and external lighting as per the above photos. The works also incorporated asbestos removal, demolition of existing shed, works to existing boundary walls, new and improved signage and revised CCTV installation.

For more information on this project please email us

Wye & Chilham Stations

Location: WYE & CHILHAM STATIONS, KENT

Description: GAUGE CLEARANCE WORKS

The works:

Gauge Clearance Works to Station platforms at Wye and Chilham Stations to facilitate the introduction of Class 465 Networker EMU vehicles.

Works included the reduction in height of platforms at various chord points along the platform. This was achieved where possible by reducing the existing mortar bed and when this was not possible by the installation of new thin copers.

For more information on this project please email us

Farncombe Station

Location: FARNCOMBE UP PLATFORM

Description: PLATFORM EXTENSION WORKS

The works:

For these Platform Extension works we firstly had to undertake a Platform gauging survey to establish current platform heights and lateral offsets. We lengthened the platform to accommodate 10 car and 12 car trains. The platform was extended by 70 metres.

For more information on this project please email us

Eastfields Station

Location: EASTFIELDS STATION

Description: PLATFORM WORKS

The works:

The works involved the construction of two platforms, one on the up side and one on the down side and all associated M & E services. We also provided the concrete bases for a new modular station building.

For more information on this project please email us

Wickford Embankment

Location: WICKFORD EMBANKMENT

Description: GABION WALL WORKS

The works:

Works were carried out at two sites, site one consisted of installing a gabion wall of 3 metres in height with additional slope re-grade over embankments. Site two involved the installation of a toe berm with the height of 2 metres and a slope angle of 25 degrees with re-grading work above the toe berm to form a slope angle of approximately 18 degrees. Also at Site 2 we extended the height of the head wall and wing walls by 1 metre of the overflow culvert, brick faced and re-used existing copings with an additional coping to the rear and then installed safety handrail around it.

For more information on this project please email us