Contracts List 2008

  • West Hampstead
    • Footbridge foundations and ancillary works.
  • Surlingham Bridge
    • General works including vegetation clearance, demolitions and alterations, brickwork repairs, steelwork and painting.
  • Paddington Pavilion
    • The complete refurbishment of the existing two storey pavilion and the construction of a single storey extension containing changing rooms and ancillary accommodation. The works also included the installation of 50,000 litre underground water storage tank and water cannon irrigation system for maintaining the international hockey pitch – Blue Flag Project.
  • Bexley, Welling and Selling
    • Gauge clearance works call off contract consisting of lowering and/or the setting back of platform copers.
  • East Huntspill Bridge
    • Demolition of existing bridge, construction of a complete new bridge including the wing walls.
  • Lidl – Poole
    • The works involved the relocation of utility services, BT lines, a CCTV camera and widening of the B3068 Blandford Road to provide access into the proposed new Lidl Store.
  • Viridor, Medway
    • Remedial works to existing ground floor slab to transfer shed, replacement of Workshop Forecourt Hardstanding, shed cladding repairs and replacement and various other works.
  • Culham Building
    • To supply and install a temporary steel building 168m2, fully water tight with two roller shutter access doors for vehicles and one pedestrian access door.
  • Giles Lane 278 Works
    • The provision of a Puffin Crossing, Carriageway, Footway, Signs, Markings and Lighting Works together with Traffic Calming Measures.
  • Factory Units 7 & 8 Borough Green
    • Construction of new industrial units 7 and 8 plus all associated works.
  • Browning Road Bridge
    • Repairs to deck soffit, brickwork repairs to the abutments and wingwalls, waterproofing the structure roadside and installation of non-conductive sheeting above the OHLE.
  • Wickford Embankment
    • Works were to two sites, involving the installation of a gabion wall and toe berm with associated works, including an extension to the head wall.
  • BRB – Newbury/LAM5
    • Emergency stabilisation and infilling works to the tunnel and aproaches.
  • Hillside Road, Dover
    • Structural repairs, replacement of bathrooms and kitchens, renewal of ceilings, loft insulation and redecoration works.
  • Walton On Thames Station
    • Teh works comprised of demoiltion of the existing structures, underpinning works to the existing platform wall, construction of a new DDA access ramp and staircase to provide a new station entrance, installation of a enw steel structure to form a new waiting area.
  • Bracknell Station
    • Works included demolition works, lift and footbridge foundation works, platform works, drainage, signing and fencing works.
  • Lippits Hill Heli Pad
    • Construction of a new Heli-strip at the Air Support Unit and associated building works.
  • St Neots Motor Cycle Test Centre
    • Provision of a new DSA test facility for Motorcycles, including a new single storey office building and test track, yards, drainage and landscaping works.
  • M20 Operation Stack
    • Construction of a centre reserve concrete hard standing to permanently store approximately 4700m of quick moveable barrier.
  • Hampton Court Station
    • Part demolition of internal walls to provide new toiilets with turnstile access. Provision of new staff/mess toilet with associated refurbishement works.
  • Carillion Maidenhead
    • Platform extension works. access ramp and footpath to the car park.
  • Stratton Memorial Gardens, Princess Risborough
    • Construction of a new Memorial Garden located on a Green Field Site – we adapted long hide to gain access to the proposed development. Installation of new electrical supply, footpath construction, drainage and ducting works and construction of two small brick structures
  • Wellington Crescent, Ramsgate
    • Repairs to cliff facade enhancing the upper retaining wall, new pedestrian guard rails and barriers, installation of new drainage system, surfacing works to the upper footway
  • Cormongers Bridge Strengthening
    • The works involved saddling the existing brick arch with fibre reinforced concrete and improve the vertical alignment of the approaches. New brick parapets and minor repairs to the arch barrel
  • Folkestone West Station
    • Refurbishment and upgrading of both the up side and down side waiting rooms with new toilet facilities, internal decoration and external door and window replacement
  • Redhill Bus Interchange
    • Demolition of existing passenger shelter and construction of new semi-enclosed waiting area. The works also involved the stripping out and refurbishment of the existing travel office and re-alignment of existing concrete
  • Refurbishment Of Sergeants Mess Accommodation
    • Works involved a new kitchen, two showers and three toilets, flooring, decoration, secondary glazing, installation of bedroom furniture and blinds