Contracts List 2010
Shorncliffe Waste Centre
- The works involved the overlaying of the reinforced concrete compactor/container slab, extension of concrete bays for container storage, resurfacing/overlay of bituminous areas, kerbing and provison of new road markings.
Elstree & Borehamwood Stations
- We carried out civil engineering works in connection with the remodelling of the station forecourt including demolition, earthworks, drainage, paving and street furniture to improve the passenger interchange.
West Hampstead Gate Line
- Works involved a topographical survey, trial holes, design of proposed foundations, the preparation of civil and M & E drawings and the preparation of specifications.
Car Parks Tranche 3
- Re-marking and minor ground works at Crewkerne and Farnborough Stations, surfacing works at Bentley, Easyleigh, Farnham, London Road – Guildford, Netley, Shawford and Warysbury Stations and lighting and CCTV works to Netley and Wraysbury stations.
St Georges, Cobham
- The works involved the construction of five ensuite bedrooms, conservatory and all associated works.
Rye Library
- The works involved the conversion of a Woolworth’s store and associated office space to a new library facility including basement store, interview rooms and staff facilities.
SAGA – Car Park Extension
- The works involved the construction of an extension to the existing car park and associated drainage and lighting works.
Pearce – Gillingham
- Section 278 Scheme – The works involved the construction of new roundabouts, slip road, drainage, traffic signals, resurfacing works to the main roundabout coming off the M2 and associated works.
Tesco Store, Yiewsley
- Section 278 works – the works involved the installation of off site highway works including, drainage, earthworks, landscaping, kerbs, footways and paved areas, fencing, pedestrian guardrails and traffic signal installation.
University Road
- The works involved the reconstruction of University Road including drainage repairs, installation of speed cushions, footway works, installation of a crossing point, road markings and guardrail installation.
Fawley Tunnel
- Tunnel repairs including brickwork repointing, crack stitch repairs and arch spandral pinning.
Gasworks Lane, Ashford
- The works included the removal of existing services and current storage facilities. A replacement temporary storage building and smaller office building were built plus provision of tarmacadam surface for parking and areas for skips.
Kent Patching 2010/2011
- Weather damage repairs to roads in East Kent and South Kent predominately patching and repairs to potholes.
Willingdon Community School
- Construction of a new detached two storey food technology pod including necessary amendments and/or alterations to services and external works
Crook Log Primary School
- The construction of a building extension to the school to provide a SEN (Special Education Needs) facility. The works included drainage and electrical works.
Fawley Tunnel
- Tunnel repairs including brickwork repointing, crack stitch repairs and arch spandral pinning.
Croydon Tramlink 2010/11
- Track crossings implementation works on the Beckenham Line to Lloyds Park Crossing.
Car Parks Tranche 1
- Works to create additional parking bays at several locations including all associated works.
Stamford Hill – Seven Sisters
- Embankment stabilisation works including footway construction and associated works.
Seymour Leisure Centre – Changing Rooms
- A complete re-fit of the male and female changing rooms and corridors incorporating 15 areas that included shower and toilet facilities. The works also included a comprehensive refurbishment of a squash court.
Southampton Parkway
- Provision of new covered walkways, cycle and trolley storage and new cycle path and associated works at Southampton Airport Parkway station.
Knowles Viaduct
- Brickwork repairs including vegetation removal throughout the structure including re-mortaring open joints and fractures, patch and isolated brick replacement. Repairs were also carried out to fractures in the parapets.
Oldborough School
- Section 278 highway improvements for school development at Boughton Lane including revised signal controlled junction at Sutton Road. The works also involved footway improvements/drainage works and pedestrian measures.
Manor Royal A23 Crawley Phase 2
- Section 278 work s including the installation of new traffic signals and carriageway reconstruction and re-alignment works.