Accreditations

Walker

LIST OF COMPLETED CONTRACTS - 2008

  • M20 Operation Stack
    • Construction of a centre reserve concrete hard standing to permanently store approximately 4700m of quick moveable barrier.
  • Hampton Court Station
    • Part demolition of internal walls to provide new toiilets with turnstile access. Provision of new staff/mess toilet with associated refurbishement works.
  • Carillion Maidenhead
    • Platform extension works. access ramp and footpath to the car park.
  • Stratton Memorial Gardens, Princess Risborough
    • Construction of a new Memorial Garden located on a Green Field Site - we adapted long hide to gain access to the proposed development. Installation of new electrical supply, footpath construction, drainage and ducting works and construction of two small brick structures
  • Wellington Crescent, Ramsgate
    • Repairs to cliff facade enhancing the upper retaining wall, new pedestrian guard rails and barriers, installation of new drainage system, surfacing works to the upper footway
  • Cormongers Bridge Strengthening
    • The works involved saddling the existing brick arch with fibre reinforced concrete and improve the vertical alignment of the approaches. New brick parapets and minor repairs to the arch barrel
  • Folkestone West Station
    • Refurbishment and upgrading of both the up side and down side waiting rooms with new toilet facilities, internal decoration and external door and window replacement
  • Redhill Bus Interchange
    • Demolition of existing passenger shelter and construction of new semi-enclosed waiting area. The works also involved the stripping out and refurbishment of the existing travel office and re-alignment of existing concrete
  • Refurbishment Of Sergeants Mess Accommodation
    • Works involved a new kitchen, two showers and three toilets, flooring, decoration, secondary glazing, installation of bedroom furniture and blinds