LIST OF COMPLETED CONTRACTS - 2008
- M20 Operation Stack
- Construction of a centre reserve concrete hard standing to permanently store approximately 4700m of quick moveable barrier.
- Hampton Court Station
- Part demolition of internal walls to provide new toiilets with turnstile access. Provision of new staff/mess toilet with associated refurbishement works.
- Carillion Maidenhead
- Platform extension works. access ramp and footpath to the car park.
- Stratton Memorial Gardens, Princess Risborough
- Construction of a new Memorial Garden located on a Green Field Site - we adapted long hide to gain access to the proposed development. Installation of new electrical supply, footpath construction, drainage and ducting works and construction of two small brick structures
- Wellington Crescent, Ramsgate
- Repairs to cliff facade enhancing the upper retaining wall, new pedestrian guard rails and barriers, installation of new drainage system, surfacing works to the upper footway
- Cormongers Bridge Strengthening
- The works involved saddling the existing brick arch with fibre reinforced concrete and improve the vertical alignment of the approaches. New brick parapets and minor repairs to the arch barrel
- Folkestone West Station
- Refurbishment and upgrading of both the up side and down side waiting rooms with new toilet facilities, internal decoration and external door and window replacement
- Redhill Bus Interchange
- Demolition of existing passenger shelter and construction of new semi-enclosed waiting area. The works also involved the stripping out and refurbishment of the existing travel office and re-alignment of existing concrete
- Refurbishment Of Sergeants Mess Accommodation
- Works involved a new kitchen, two showers and three toilets, flooring, decoration, secondary glazing, installation of bedroom furniture and blinds