During green zone protection (T3 and T2H), we carried out pressure washing works to the platform canopy. We also carried out preparation and painting works to all previously decorated surfaces of the canopy including supporting structure, fascias, gable panels and roof soffit.
Cleaning was carried out to both sides of canopy glazing. Cleaning of all rainwater goods including valley gutter and ensure free flowing was also undertaken.
We replaced both external down pipes located within the 6 ft Canopy.