<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Walker Construction UK &#187; Bridge</title>
	<atom:link href="http://www.walker-construction.co.uk/category/completed-projects/bridge-contracts/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.walker-construction.co.uk</link>
	<description>Founded 1964</description>
	<lastBuildDate>Fri, 21 Oct 2011 12:21:24 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Harley Shute Footbridge</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/harley-shute-footbridge/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/harley-shute-footbridge/#comments</comments>
		<pubDate>Thu, 11 Aug 2011 07:32:35 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=1080</guid>
		<description><![CDATA[The works comprised of the erection of side hoardings and gates.  We provided and maintained traffic management measures for the duration of the works.  We obtained the design and technical approval for suitable access scaffolding arrangements.  We had to dismantle and remove the existing GRP parapet panels.  Then install are replacement [...]]]></description>
			<content:encoded><![CDATA[<p>The works comprised of the erection of side hoardings and gates.  We provided and maintained traffic management measures for the duration of the works.  We obtained the design and technical approval for suitable access scaffolding arrangements.  We had to dismantle and remove the existing GRP parapet panels.  Then install are replacement system of parapet panels and to complete the project we carried out maintenance painting of the footbridge.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/harley-shute-footbridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>West Hampstead Footbridge</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/west-hampstead-footbridge/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/west-hampstead-footbridge/#comments</comments>
		<pubDate>Wed, 19 Jan 2011 13:31:15 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=947</guid>
		<description><![CDATA[The contract works included for 14 metres to 20 metres deep concrete CFA piles, installed to each platform, so as to form the link bridge foundations.  The works also involved the complete management of the link bridge installation.
The new footbridge is a unique design which is currently the largest sized footbridge installed within the Southern [...]]]></description>
			<content:encoded><![CDATA[<p>The contract works included for 14 metres to 20 metres deep concrete CFA piles, installed to each platform, so as to form the link bridge foundations.  The works also involved the complete management of the link bridge installation.</p>
<p>The new footbridge is a unique design which is currently the largest sized footbridge installed within the Southern section.</p>
<p>The sections of the bridge consisted of complete stair sections, complete lift shaft sections and complete link span sections.  Due to the size of sections a 1000 tonne crane was utilised to lift the sections into position.  Two number all line block possessions were required to completely install the footbridge.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/west-hampstead-footbridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Oxhey Park Bridge, Watford</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/oxhey-park-bridge-watford/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/oxhey-park-bridge-watford/#comments</comments>
		<pubDate>Wed, 19 Jan 2011 13:28:06 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=945</guid>
		<description><![CDATA[The works involved the design and construction of a new bridge to span across the River Colne to provide access for cyclists and pedestrians.
]]></description>
			<content:encoded><![CDATA[<p>The works involved the design and construction of a new bridge to span across the River Colne to provide access for cyclists and pedestrians.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/oxhey-park-bridge-watford/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Bracknell Station</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/bracknell-station-2/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/bracknell-station-2/#comments</comments>
		<pubDate>Tue, 20 Apr 2010 10:50:37 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=813</guid>
		<description><![CDATA[The works involved the construction of a new single span steel footbridge, lift shafts and stair access between platforms 1 and 2 including groundworks and electrical installation but excluding the lift installation.
]]></description>
			<content:encoded><![CDATA[<p>The works involved the construction of a new single span steel footbridge, lift shafts and stair access between platforms 1 and 2 including groundworks and electrical installation but excluding the lift installation.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/bracknell-station-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Thorpe Le Soken</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/thorpe-le-soken/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/thorpe-le-soken/#comments</comments>
		<pubDate>Tue, 20 Apr 2010 10:45:21 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=809</guid>
		<description><![CDATA[The works were to the underside of bridge soffit – 4000 psi pressure washed with munro spinning head.  Mechanical preparation to corrosion sores.  Painting to Network Rail specification M24. 800 m2.
Roadside parapet – fully encapsulated scaffold.  Wet grit blasted to remove lead coated paint.  Removed hazardous waste.  Dry blasted to standard SA 2.5. painting to [...]]]></description>
			<content:encoded><![CDATA[<p>The works were to the underside of bridge soffit – 4000 psi pressure washed with munro spinning head.  Mechanical preparation to corrosion sores.  Painting to Network Rail specification M24. 800 m2.</p>
<p>Roadside parapet – fully encapsulated scaffold.  Wet grit blasted to remove lead coated paint.  Removed hazardous waste.  Dry blasted to standard SA 2.5. painting to Network rail specification M20. 250 m2.</p>
<p>Trackside handrails and girders – 4000 psi pressure washed with munro spinning head.  Mechanical preparation to corrosion sores.  Painting to Network Rail specification M24. 350 m2.</p>
<p><strong> </strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/thorpe-le-soken/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Laindon High Road</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/laindon-high-road/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/laindon-high-road/#comments</comments>
		<pubDate>Tue, 20 Apr 2010 10:40:52 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=804</guid>
		<description><![CDATA[The works included for the removal of the existing road surfacing, footpaths etc…  We excavated to bridge deck level to expose existing waterproofing layer.  Supplied and laid new Wolfrin waterproof membrane to bridge deck.  We reinstated the carriageway to Local Authority specification including for new footpaths and deterrent paving.  All works carried out on half [...]]]></description>
			<content:encoded><![CDATA[<p>The works included for the removal of the existing road surfacing, footpaths etc…  We excavated to bridge deck level to expose existing waterproofing layer.  Supplied and laid new Wolfrin waterproof membrane to bridge deck.  We reinstated the carriageway to Local Authority specification including for new footpaths and deterrent paving.  All works carried out on half road closures.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/laindon-high-road/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Seven Sisters Road</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/seven-sisters-road/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/seven-sisters-road/#comments</comments>
		<pubDate>Tue, 20 Apr 2010 10:38:39 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=801</guid>
		<description><![CDATA[Trackside – 4000 psi pressure wash with munro spinning head to parapet and deck. Power disc corrosion sores.  Applied paint to Network Rail specification XM92 (M24). Surface area 970 m2.
Roadside parapet – fully encapsulated scaffold. 1500 psi pressure wash to remove salts and contaminants.  Wet grit blast to remove lead coated paint.  Cleared and removed [...]]]></description>
			<content:encoded><![CDATA[<p>Trackside – 4000 psi pressure wash with munro spinning head to parapet and deck. Power disc corrosion sores.  Applied paint to Network Rail specification XM92 (M24). Surface area 970 m2.</p>
<p>Roadside parapet – fully encapsulated scaffold. 1500 psi pressure wash to remove salts and contaminants.  Wet grit blast to remove lead coated paint.  Cleared and removed hazardous waste.  Dry grit blast to standard SA 2.5. applied paint to Network rail specification XM92(M21).  Surface area 540 m2.</p>
<p>Roadside soffit and cross girders – 4000 psi pressure wash with munro spinning head.  Power disc corrosion sores.  Applied paint to Network Rail specification XM92 (M24). Surface area 1300 m2.  Works were carried out during night time lane closures.</p>
<p>All works completed on time and in budget.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/seven-sisters-road/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Spexhalls Rail Bridge</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/spexhalls-rail-bridge/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/spexhalls-rail-bridge/#comments</comments>
		<pubDate>Tue, 20 Apr 2010 10:33:29 +0000</pubDate>
		<dc:creator>sue</dc:creator>
				<category><![CDATA[Bridge]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://www.walker-construction.co.uk/?p=794</guid>
		<description><![CDATA[The works involved brickwork repairs, the installation of temporary access works, the installation of precast concrete bridge beams, the complete construction of a new carriageway including waterproofing and services ducting.
]]></description>
			<content:encoded><![CDATA[<p>The works involved brickwork repairs, the installation of temporary access works, the installation of precast concrete bridge beams, the complete construction of a new carriageway including waterproofing and services ducting.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/spexhalls-rail-bridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ely Underbridge</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/ely-underbridge/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/ely-underbridge/#comments</comments>
		<pubDate>Fri, 14 Aug 2009 13:42:59 +0000</pubDate>
		<dc:creator>barry</dc:creator>
				<category><![CDATA[Bridge]]></category>

		<guid isPermaLink="false">http://www.oakcreative.net/clients/walker/?p=54</guid>
		<description><![CDATA[To construct two insitu concrete constructed box culverts, with front abutments, to the East &#38; West banks to house a new steel constructed bridge to carry rail freight over the River Great Ouse.  Also included in these works was loose laid Wolfin waterproofing membrane to the overbridge section, bridgeguard concrete protection system sprayed to [...]]]></description>
			<content:encoded><![CDATA[<p>To construct two insitu concrete constructed box culverts, with front abutments, to the East &amp; West banks to house a new steel constructed bridge to carry rail freight over the River Great Ouse.  Also included in these works was loose laid Wolfin waterproofing membrane to the overbridge section, bridgeguard concrete protection system sprayed to all external surfaces and site fencing re-instated to match existing.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/ely-underbridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Orpington Station</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/orpington-station/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/orpington-station/#comments</comments>
		<pubDate>Fri, 14 Aug 2009 13:42:48 +0000</pubDate>
		<dc:creator>barry</dc:creator>
				<category><![CDATA[Bridge]]></category>

		<guid isPermaLink="false">http://www.oakcreative.net/clients/walker/?p=53</guid>
		<description><![CDATA[Fabrication and installation of a new steelwork pedestrian footbridge, lift shafts and stair access to existing island platforms.  Installation of new lift cars and lift machine rooms and all associated lift services.  Installation of piled foundations and reinforced pile caps, pits and slabs.  Existing services protection and diversions and installation of new [...]]]></description>
			<content:encoded><![CDATA[<p>Fabrication and installation of a new steelwork pedestrian footbridge, lift shafts and stair access to existing island platforms.  Installation of new lift cars and lift machine rooms and all associated lift services.  Installation of piled foundations and reinforced pile caps, pits and slabs.  Existing services protection and diversions and installation of new services including power supply cables, lighting and drainage, signage on step free route.  Installation of tactile paving at platform edges and to the top and bottom of proposed stairs.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/orpington-station/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ockley Bridge</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/ockley-bridge/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/ockley-bridge/#comments</comments>
		<pubDate>Fri, 14 Aug 2009 13:42:37 +0000</pubDate>
		<dc:creator>barry</dc:creator>
				<category><![CDATA[Bridge]]></category>

		<guid isPermaLink="false">http://www.oakcreative.net/clients/walker/?p=52</guid>
		<description><![CDATA[The works comprised of the Demolition of the existing bridge and a section of the adjacent walls.  The bridge and adjacent walls were then Reconstructed including underpinning and all associated works. 
]]></description>
			<content:encoded><![CDATA[<p>The works comprised of the Demolition of the existing bridge and a section of the adjacent walls.  The bridge and adjacent walls were then Reconstructed including underpinning and all associated works. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/ockley-bridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Cramner Bridge</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/crammer-bridge/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/crammer-bridge/#comments</comments>
		<pubDate>Fri, 14 Aug 2009 12:52:13 +0000</pubDate>
		<dc:creator>barry</dc:creator>
				<category><![CDATA[Bridge]]></category>

		<guid isPermaLink="false">http://www.oakcreative.net/clients/walker/?p=49</guid>
		<description><![CDATA[The bridge is a steel structure spanning across Cramner Road in East London in a residential area to a local school.
The works were undertaken during a full road closure implemented by Walker Construction. An encapsulated structure was erected to the soffit and parapets of the structure to enclose all exposed areas of steelwork. The encapsulation [...]]]></description>
			<content:encoded><![CDATA[<p>The bridge is a steel structure spanning across Cramner Road in East London in a residential area to a local school.</p>
<p>The works were undertaken during a full road closure implemented by Walker Construction. An encapsulated structure was erected to the soffit and parapets of the structure to enclose all exposed areas of steelwork. The encapsulation included for insulation within the side walls to reduce the noise of the works. The structure was shotblasted to SA2.5 and a M20 paint system was applied to all exposed steel areas. The works were undertaken during January through to March 2005. Despite the weather conditions during the Winter months the works were finished to programme and to the specified standard. Contingency plans were made within the original programme for weather related delays as well as mitigating bad weather with regards to steel, temperatures, humidity etc.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/crammer-bridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Bryants Bridge</title>
		<link>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/bryants-bridge/</link>
		<comments>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/bryants-bridge/#comments</comments>
		<pubDate>Fri, 14 Aug 2009 11:38:58 +0000</pubDate>
		<dc:creator>barry</dc:creator>
				<category><![CDATA[Bridge]]></category>

		<guid isPermaLink="false">http://www.oakcreative.net/clients/walker/?p=42</guid>
		<description><![CDATA[The demolition and reconstruction of the main span of a three span arch bridge.
The main span was replaced with a precast concrete beam and an insitu concrete deck over, complete with waterproofing new P2 parapets, reconstruction of approach roads, drainage, safety barrier and  landscaping works.
]]></description>
			<content:encoded><![CDATA[<p>The demolition and reconstruction of the main span of a three span arch bridge.</p>
<p>The main span was replaced with a precast concrete beam and an insitu concrete deck over, complete with waterproofing new P2 parapets, reconstruction of approach roads, drainage, safety barrier and  landscaping works.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.walker-construction.co.uk/completed-projects/bridge-contracts/bryants-bridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

