Contact Us Report Safety Concern News

Case Studies: Rail

Braintree Freeport Footbridge

The works involved the construction and installation of a footbridge with DDA, pedestrian and cycle access. The bridge is located south of Braintree Freeport Station and was constructed in order to provide a link from the Heathlands residential area to the west of the railway line with Braintree Freeport Station and the retail and leisure complex to the east.

Read More

Hampstead Heath Station

The project was for the demolition of the existing station building and construction of new station building and installation of DDA lifts to serve platforms 1 and 2.

Read More

St Albans Station

New platforms were constructed by excavating footings and constructing cross walls with hollow plank placed on top to form the main platform base. These extensions are to facilitate 12 car trains.

Read More

Canterbury West Station

Remodelling of the existing forecourt and car park was carried out in two phases. This was an existing block paved car park with 45 spaces to be increased to 63.

Read More

Crystal Palace Station

The project at Crystal Palace Train Station was commissioned from a requirement for the station to upgrade passenger capacity improvement works.

Read More

Waterloo International Station

Walker Construction were employed by the British Rail Residuary Board (BRB) to carry out refurbishment works to the main roof, covering the original International Station as Network Rail want to bring the facility back into use.

Read More

West Malling Station

The works involved Remodelling of Forecourt, Passenger Drop Off, Car Park and Station Approach at West Malling Station. This project was the Design & Build Contract to improve the environment of West Malling Station

Read More

Gravesend Cycle Hub

Grasping Life By The Handlebars

Read More
© Copyright Walker Construction Ltd. 2017 - Developed by R.K Group eMedia